
Emergency Leak Solution
Online leak sealing with belt kits and engineered mechanical clamps, often in 15–30 minutes and without stopping production.

Online leak sealing with belt kits and engineered mechanical clamps, often in 15–30 minutes and without stopping production.

Weld-equivalent pipe connections installed without hot work, from site survey and genuine fitting supply to pressure testing.

Restore pipeline strength without welding or shutdown with composite reinforcement designed to ASME PCC-2 and ISO 24817.

Design, supply and installation of ICCP and sacrificial anode systems, tested and documented to international standards.

Close interval potential and DCVG surveys that locate coating defects and verify cathodic protection along the pipeline route.

In-line cleaning, gauging, drying and batching runs, planned, tracked and reported by our pigging team.

Surface preparation, anti-corrosion and moisture-tolerant epoxy coatings, re-coating and full QA/QC for pipelines and facilities.
Let’s work together
Tell us the line, the service and the constraint, whether it is a shutdown window, access or budget. Then we will come back with the right technology, correctly sized, from the right principal.

PT Saka Nusa Persada is a general contractor and supplier of pipeline integrity solutions for Indonesia’s mining, oil and gas industries, backed by world-class principals.